Stormwater Erosion Control Edition - Aug 10th, 2022
 
 
Stormwater Erosion Control Edition | View online
 
August 10, 2022
Sponsored

Since Bowie Industries has a full manufacturing facility, full turnkey solutions can be provided. Sheetmetal operations, welding, painting, and assembly are all done in house. Custom mountings on customers trucks with integrated toolboxes can be done on site for a complete product.

FEATURED
Writing design guidance for protection pipe outfalls, and intersection bioswales, from scour.
What can be done with construction site sediment when the job is done? The solution may not be yours alone.
Sponsored

Faircloth Skimmer® surface drains float on the surface, releasing the cleanest water while draining the basin slowly over several days at a constant rate to maximize settling. Learn more through our webinar, “Building a Better Sediment Basin.”

TOP STORIES
Federal agencies have released a plan to restore wetlands and create marshes to address injuries caused by the Deepwater Horizon oil spill.
New research of coastal resilience finds that in the next 100 years costal barrier islands’ retreat rate could increase by over 50%, diminishing its buffer and protection.
NEWS
Estimated to cost $1.2 million, this is the first project in New York City to transform a large roadway median into a green infrastructure area that will absorb stormwater.
The District of Columbia has released five draft flood resiliency action plans, which is the first of three action plan phases planned for 2022 throughout the District.
The San Francisco Bay, Morro Bay, and Santa Monica Bay National Estuary Programs will each receive up to $4.5 million over five years to protect water quality and build shoreline resilience.
The Water Environment Federation has selected 14 members for its 2022 class of WEF Fellows, honoring exemplary contributions to the WEF community and significant professional achievements.
PRODUCTS & SERVICES VIDEOS
The Remote Operated Launcher System uses high-pressure compressed air technology to rapidly install soil nails at a speed of nearly 250 miles per hour without producing drill cuttings or spoils.
When the job site demands absolute performance, the Flexterra® HP-FGM® stands as a reliable erosion control and revegetation solution. It's immediately effective upon application, bonding directly to the soil.
StormRax™ Round Series racks from Plastic Solutions are the perfect water screening solution for round structures made from concrete, metal or HDPE pipe. They have been proven durable, and an economical alternative to steel.
The Faircloth Skimmer surface drain is a BMP for sediment basins and stormwater management that floats on the surface of the sediment basin, releasing the cleanest water in the basin instead of draining from the bottom.