2025 Top Projects | Maple Canyon Restoration & Flood Mitigation Project

The restoration project focused on mitigating severe flooding.
Sept. 2, 2025

Maple Canyon is a natural drainage corridor that receives runoff from more than 100 acres through 16 storm drain systems. It also lies within a Federal Emergency Management Agency (FEMA) Zone A floodplain and has historically been subject to severe flooding, erosion and infrastructure failure resulting from uncontrolled urban runoff and undersized stormwater systems. Thus, the Maple Canyon Restoration and Flood Mitigation Project implemented a comprehensive watershed-scale solution to severe flooding.  

To view the entire Stormwater Solutions video library, click here.

To view more educational resources, visit Stormwater University.

Make a nomination for the 2026 Top Projects here.

About the Author

Katie Johns

Katie Johns, editor-in-chief of Stormwater Solutions, graduated from the University of Missouri in 2016 with a Bachelor of Journalism and a Bachelor of Arts in Spanish. Johns joined the Stormwater Solutions team in September 2019. Johns also helps plan the annual StormCon conference and co-hosts the Talking Under Water podcast. Prior to entering the B2B industry, she worked as a newspaper reporter and editor in Sarasota, Florida, and a magazine assistant editor in the Chicago suburbs. She can be reached at [email protected].

Sign up for Stormwater Solutions Newsletters
Get the latest news and updates.