Mark Mihm, senior engineer with Dallas Water Utilities, drops by to discuss the Bachman Lake Dredging and Dam and Spillway Rehabilitation Project, of which he is the project manager. Dredging for the project is now complete, and the next phase includes the rehabilitation of the Bachman dam and spillway to address regulatory flood capacity. Mihm gives an overview of the project, benefits seen so far and what the next steps are.
To view the entire Stormwater Solutions video library, click here.
Katie Johns, editor-in-chief of Stormwater Solutions, graduated from the University of Missouri in 2016 with a Bachelor of Journalism and a Bachelor of Arts in Spanish. Johns joined the Stormwater Solutions team in September 2019. Johns also helps plan the annual StormCon conference and co-hosts the Talking Under Water podcast. Prior to entering the B2B industry, she worked as a newspaper reporter and editor in Sarasota, Florida, and a magazine assistant editor in the Chicago suburbs. She can be reached at [email protected].